Your Perfect Assignment is Just a Click Away
We Write Custom Academic Papers

100% Original, Plagiarism Free, Customized to your instructions!

glass
pen
clip
papers
heaphones

ENG 10003: Mechanics of Structures Final Project

ENG 10003: Mechanics of Structures Final Project

ENG 10003: Mechanics of Structures Final Project Semester 2 2021

Version 1.3 July 2021

Assessment Title: Design and Build Your Model Bridge

Due Dates: First submission: 20th September 2021 by 11:59pm AEST with peer-review feedback component to be completed no later than the 24th September (7%) Final submission: 7th November by 11:59pm AEST (33%) Total Assessment Weighting: 40% Assessment Type: Individual, with assessable peer review activity for first submission Individual or optional group of 2 for final submission Aims This project aims to further develop your understanding of the key learnings from this unit (and to exercise your brain to churn creative solutions while working from home.)

Project Learning Outcomes Students who successfully complete this project should be able to:

1. Identify an existing bridge (online) and explore the forces and/or other actions acting on the bridge and describe how the bridge maintains equilibrium and stability. Consider traffic load/ wind load or any other type of loads that you can identify. Reflect on a previous bridge failure and lessons learnt.

2. Plan and design your own bridge with materials that you can find from home – minimum clear span of 600mm. The bridge must sustain the loads for a minimum of 10 seconds. Minimum width of bridge (80mm). The total weight of your bridge should not exceed 1kg. Challenge yourself to create a bridge that can carry the heaviest load. Be as Creative with the built as you can!).

Theme of design: Heaviest load carrying, creative built

Your Tasks You have been contracted to design a bridge from materials from home (for example spaghetti, popsicle sticks, marshmallows, straws, toilet paper roll, Lego blocks or anything else that you can think of).

First submission report – mandatory Task 1: Background research (for submission in first stage and refined for final submission)

1) Research an existing bridge online. a) Describe the type of bridge, location, materials, span, member sizes, support type b) Identify type of loads acting on the bridge – direction of loads acting on the bridge

ENG 10003 Mechanics of Structures Final Project Semester 2 2021

Version 1.3 July 2021

c) Identify tension and compression members, sketch free body diagrams and describe how the bridge maintains its equilibrium

d) Identify 3 points of advantages and disadvantages for this type of bridge

2) Research on a bridge that has failed in the past a) Identify what were the causes of failure b) What are the lessons learnt? c) If you were the design engineer, what would you have done differently?

Task 2: Plan and design your own bridge (for submission in first stage and refined for final submission)

3) Do a search on Google if you need inspiration for DIY bridge (for e.g. Spaghetti bridge, straw bridge etc.)

4) Plan the design of your bridge a. explain selection of materials, b. identify how to connect pieces together, c. explain why you have chosen the shape of the bridge d. targeted span and loads that it can carry – do some trials if necessary to justify the

loads that you think your bridge can carry (Remember, your home-made bridge should have a clear span of 600mm minimum)

5) Explain how are you ensuring stability of the bridge, identify where could the bridge potentially fail, what a

Order Solution Now