Discussion: Work breakdown structure

Discussion: Work breakdown structure

Work breakdown structure
Complete an activity list for the library project including tasks specific to listed objectives, tasks duration and preceding activities for the library project with a duration of 3 years to complete the objectives are listed below. Please don’t go too indepth with construction and remember to adhere to what is listed in the objectives

Project Budget

Fixed Project Budget: £46m (million)

Students will need to determine how to allocate this budget against the different activity project stages and primary activities e.g. requirements, design, build, testing and the procurement of equipment etc.

Project Timescale

Fixed Timescale: The project must be delivered within 3-years

Al related project stages and activities must be delivered within this timescale

Project objectives and primary design requirements

· The size of the library will be 7,400m2

· 7 storeys high

· A double height entrance space to address the streetscape

· Needs to house 154,000 physical books

· 200 Laptops for loan

· 530 new PCs

· 916 study spaces

· A Café

· A study hub (for student advice and guidance)

· Silent study spaces on each of the upper 4 floors

The building should have a strong civic presence and have gravitas.

The building must be connected to the adjacent Campus Centre and Business School at first floor level – continuing and extending a network of linking bridge spaces that run throughout the campus.

The overall design should be energy efficient and highly sustainable in nature.

The project must adhere to the stated budget and time constraints.

Activity Number

Duration

Weeks/Days

Preceding Activity/ Activities

Each activity must include

task ID, duration and other

activities (IDs) that it may be

dependent on

Early Start (ES)

Early Finish (EF)

Float

Activity Number

Description

Duration

Late Start (LS)

Late Finish (LF)

using the following template to create a network diagram,showing the critical path including slack, es, ef, ls,lf

Complete all possible risk that might be associated with the library project, risk must not be generic

Project: Author:

Distribution:

Status/Version:

Date:

Ref

Date

Risk Description

Probability

(P)

Impact

(I)

Risk

Rating

P X I

Action/Counter

Measure

Responsibility

Review

Date

Status/Review

Comments

1.

2.

3.

4.

5.

6.

7.

8.